Nah, pop had to swat the lines with the back of his hand to show it weren't hot.
Main OFF, Submain OFF and 25A MCB OFF…..3 stages of isolation from bites.
Working on 'small' mains, with insulated cable, I obviously always isolate (and lock
off with a real padlock) everything that I'm working on. But out of habit I tend not to touch conductors anyway, and on a small job it's quite possible to do the whole thing in a way that would have been non-eventful if you had worked on it live.
Whoever, when you get to bigger stuff there's always a point where it just becomes a metalwork job and you
have to touch what would normally be live uninsulated conductors. No matter how many times I've checked lockouts, how many times I've stuck a meter between the conductor and earth, and even when I've deliberately earthed the normally live conductors, I
still get a slight tingle of apprehension just before actually touching the conductors for the first time.