Err no not really, the heavy inertia will stop gap the time between high demand and more power being put in by the energy source. The guy does not know what he is talking about.
Nope, he knows exactly what he's talking about. As do National Grid who are taking steps to deal with this exact problem. See my thread about this here:
https://www.eevblog.com/forum/renewable-energy/it's-happening-the-power-grid-is-changing/And some copy-paste from the National Grid's website:
http://www2.nationalgrid.com/Enhanced-Frequency-Response.aspxBackground
The changing generation mix in GB is reducing the contribution that synchronous generation makes
to the energy market, which in turn is reducing the level of system inertia, particularly on low demand
days. Lower system inertia affects the ability of the System Operator (SO) to manage the system
frequency within normal operating limits. This in turn will drive the procurement of larger volumes of
the existing frequency response products. NGET is therefore investigating alternative solutions, one
of which is the creation of an enhanced frequency response service. The aim of this service will be to
improve management of system frequency pre-fault, i.e. to maintain the system frequency closer to
50Hz under normal operation, however performance in post-fault conditions is also of interest.
NGET believes that the most appropriate way to develop this new service is to run a tender for four
year contracts for enhanced frequency response capability. This will give NGET experience in
integrating enhanced frequency response into the suite of system management options, as well as
providing a competitive route to market for new technologies. Whilst a number of the energy storage
solutions currently available have the ability to provide frequency response in these enhanced
timescales, NGET welcomes the participation of any technology types which can meet the required
parameters.