Painfully slow progress in my electronics work area, but getting there.
The shelving above the two benches seen here is now complete, but the benches are both temporary patches, till I can make ones that fit the space better. That rack of gear is still being worked on, and has a mile-long to-do list. Off picture to the right is another small bench, that will be a soldering, desoldering, SMD & microscope/video-inspection station. It's currently having shelving added for gear above it.
There are also to be some LCD screen swing arms mounted on the shelves and sides of the rack, to get monitors off the benches.
Also an 'organizer' small shelving thing to go on top of a drawers cabinet visible far left (behind the chair), to hold random stuff like battery chargers, laptops, small NAS units, USB HD docks, chip programmer, EPROM eraser, etc.
Lastly one more small workbench on lockable castors, that can be pulled in at the left of the main bench here, to give extra work surface in an L shape when needed.
You do not want to see the view looking the other way here. Big mess.