Here's a panorama of may lab in January 2020. I rearranged a few things since my last post on this thread.
The latest addition was a Fluke 8502A 61/2 digit multimeter and the top scope of the two Siemens scopes that sit on it.
I hope the Fluke can take the weight.
On the right is the "tower of power", all my power supplies in easy reach. Below the PSU's are my SMD component drawers. As I've switched to mainly using surface mount this is a very convenient place for them.
The left hand side is now taken over by new bigger component drawers that were surplus at work.
It's a much neater solution than the hodge podge of drawers I used to have. If you're German you may know where these came from
.
At the moment I'm thinking of building a new workbench, I'm thinking of an integrated solution that can easily (well, that's relative) be moved to another place/flat/house. With integrated solution I mean not to rely on shelves on the wall, rather have the bench and shelves in one stand alone piece of furniture. That's a project for the summer holidays, maybe.