How about setting up the rocket sled as part of the narrow joining section?
The simplest arrangement being to just add another piece to the front of the existing section, maybe doubling its width, and build the rocket sled rails parallel to the train tracks. Would have to move the 'operate trains' time switch back a bit.
Juts a thought.